Value of Travel Time Savings

The value of travel time savings is the money value placed on an hour saved in transit. It is the number that drives most of the benefit side of most transport business cases. The standard British synthesis, by Pedro Abrantes and Mark Wardman in 2011, pooled 226 studies from 1960 to 2008 and 1,749 valuations. The value is a modelled quantity with a framework behind it and not a single settled figure, and its core assumption, that travel time is unproductive, has been questioned by the field itself.
What it is
When a transport scheme shortens journeys, someone has to say what the saved minutes are worth. Appraisal practice answers with a value of time per hour, usually differing by journey purpose, and applies it to the number of travellers and minutes saved. Summed over the life of the scheme and discounted to a present value, these savings often make up the largest single benefit.
The values are estimated rather than assumed. Researchers observe or ask how much travellers will pay to save time, and meta-analysis combines the results. The British synthesis reports that the value rises with income, with an elasticity of about 0.9 with respect to gross domestic product per head. That means that a one per cent rise in income per head is associated with a rise of about nine tenths of one per cent in the value of time.
In effect
The Lyons survey found a substantial, if not overwhelming, incidence of positive utility of travel time use. It was strongest among business travellers and present for commuting and leisure travel. The authors argued that this raises questions about the economic benefits assumed from policies that cut journey times. If some travellers are working, reading or resting productively, a saved minute is worth less than the unproductive-time assumption implies.
The worked case is High Speed 1. The National Audit Office valued the journey time savings at 7,000 million pounds in present value to 2070, within a range of 6,100 to 7,700 million, against construction of 6,163 million pounds in outturn terms. The two are not directly comparable, since one is a cash outturn and the other a present value, and the auditor set the savings against net taxpayer costs of about 10,200 million. What reduced the scheme's return was demand: actual passenger numbers between 2007 and 2011 averaged about a third of the level forecast in 1995. An appraisal can be right about the value of an hour and wrong about the number of people who will buy one.
Comfort is priced in the same framework. The crowding multiplier expresses the burden of crowded travel as a multiple of seated time, which is why speed and quality are measured in the same currency and are not rivals.
What it does not say
It is not a settled single figure. No per-minute monetary value is quoted here, because the guidance documents behind current official values were not read in the original.
It does not say that travel time has no value as time. The Lyons survey qualifies the assumption of unproductive time and does not remove the value of speed.
It does not show that quality improvements beat speed improvements. That is a question about the cost of each.
Both papers were read at the level of abstract and bibliographic record, not the full text.
Where it comes from
The synthesis is Abrantes and Wardman, published in 2011 in Transportation Research Part A. The first author is Abrantes; the paper is often cited as Wardman, which misattributes it. The field's own challenge to the assumption underneath the number came earlier. Glenn Lyons, Juliet Jain and David Holley surveyed 26,221 British rail passengers by post in autumn 2004 and published the results in 2007. They asked how passengers used their time on the train, how worthwhile they thought the use was, and what part mobile technology played.
Where opinion differs
Appraisal specialists regard the value of time as a well-established empirical quantity with a large evidence base, and see productive use of time as a refinement to be incorporated. Researchers on travel behaviour put more weight on the finding that time use is changing, with mobile technology making the trip itself a place to work or rest, and argue that benefits assumed from shorter journeys may be overstated for some groups. A 2013 comparison of the 2004 and 2010 survey waves exists and was verified for its existence and authorship only. Both camps are describing the same framework from different sides, and neither proposes dropping it.
How this site uses it
The Why We Project uses the concept to test claims made about transport and journey quality. It marks the point at which a popular argument, that engineers count minutes and ignore experience, meets a literature that has measured both.
Sources
- Abrantes, P. A. L., & Wardman, M. R. (2011). Meta-analysis of UK values of travel time: An update. Transportation Research Part A, 45(1), 1-17. doi:10.1016/j.tra.2010.08.003. Abstract and bibliographic record read.
- Lyons, G., Jain, J., & Holley, D. (2007). The use of travel time by rail passengers in Great Britain. Transportation Research Part A, 41(1), 107-120. doi:10.1016/j.tra.2006.05.012. Abstract and bibliographic record read.
- Lyons, G., Jain, J., Susilo, Y., & Atkins, S. (2013). Comparing rail passengers' travel time use in Great Britain between 2004 and 2010. Mobilities, 8(4), 560-579. Existence and authorship verified; no figure used.
- National Audit Office (2012). The completion and sale of High Speed 1. HC 1834. Executive summary read in full.